What paperwork do I need to complete?

Find the important details for completing your certification documentation.

  • Certification

Paperwork must be done when the electrical work is completed.

The type of paperwork and other things that need to be completed depends on the work. Here is what’s meant by a few key terms:

The risk category of the prescribed electrical work (PEW)

  • Low includes replacements and repairs on existing installations
  • High includes Mains Work, PV Solar, along with other special installations such as medical, hazardous etc
  • General includes all the other work such as installation, sub-circuits & sub-boards.

Final connection of installation to a power supply

“Connection” is the final bit of PEW that, when completed, will allow electricity to flow into the installation.

For example, it’s the final act in hooking in the mains, so that when a person inserts the supply fuse carrier it powers up the MEN Board. Inserting the fuse is not PEW.

Issued

This is when the person responsible completes the certificate and gives a copy to the person who contracted for the work.

Certification requirements for photovoltaic (PV) systems

Different PV systems have specific requirements for example.

Where there is a mains inverter within the PV system, which is a low voltage mains parallel system that is connected to the national grid, the inverter must be installed to comply with the standards AS/NZS 3000 and AS 4777.1. This work is categorised as high-risk PEW which will require certification and a record of inspection (ROI).

To learn more about certification WorkSafe have provided guidance.

PV certification compliance(external link) — WorkSafe

Quick guide overview

Risk categories determine certification requirements.

Certification requirement Low-risk work General work High-risk work
Certificate of Compliance (CoC) Optional Required Required
Record of Inspection (RoI) Not required Not required Required
Electrical Safety Certificate (ESC) Required Required Required
Entry on Electricity and Gas High-risk Database (by electrical inspector Not required Not required Required

Basic information

This handy quick guide should give you a good idea of what’s needed based on the type of work you’re doing:

Title Content
Low-risk
  1. Certify Safety (ESC)
  2. Provide client with ESC
  3. Keep files for 7 years
High-risk
  1. Certify Compliance (safe to connect) CoC
  2. Record of Inspection (issued by inspector) RoI
  3. Connect
  4. Certify Safety (ESC)
  5. Provide client with CoC and RoI documentation
  6. Keep files for 7 years
General
  1. Certify Compliance (CoC)
  2. Connect
  3. Certify Safety (ESC)
  4. Provide client with documentation (CoC and ESC)
  5. Keep files for 7 years

Visual guide

Plan the work, Undertake the work, Test the work for compliance and safety.

More details

High risk work 

Inspection

  • all high-risk work requires independent inspection by a licensed electrical inspector who is competent in the high-risk PEW they are inspecting.
  • the inspector must be independent and not associated in any way with the work they are inspecting
  • the inspector must issue a Record of Inspection (RoI) and lodge this on the high-risk Energy Safety data base

    Electricity and Gas High-risk Database(external link)
  • no high-risk PEW work is legally complete until the COC and RoI is issued
  • for high-risk work, the RoI issued by the Electrical Inspector must have the relevant CoC attached.

Low risk work

Replacement or repair work example, the replacement of a light switch or power outlet or RCD needs to be verified it is electrically safe. This done by issuing an ESC.

General risk PEW

This is generally installation work (new additions, alterations, rewires, new and extended circuits) but is not high risk or low risk work.

General PEW requires you to issue  a Certificate of Compliance (CoC) and ESC.

Final connection of installation to power supply

The person doing that final connection is responsible for ensuring that the installation they are connecting to is electrically safe. They are responsible for issuing the ESC.

If that person has not carried out that work on the installation then they have to verify it is safe to connect.

They must sight the CoC and RoI. They can rely in good faith on these documents and only then complete that final connection. It is recommended that person retain copies of these certificates.

Approved certification documentation

You’re allowed to make certification documentation in lots of different formats, such as paper and digital/electronic. A design check list is available from the Worksafe website.

Electrical certification and record of inspection templates(external link) — Worksafe

You can also get documents that are already made from:

  • most electrical suppliers/wholesalers
  • our forms page
  • Providers of online and cloud based electrical compliance and certification programmes.

The Certificate of Compliance (CoC) and the Electrical Safety Certificate (ESC) are often combined. The 2 documents serve different purposes and in all cases the ESC is the final part of the document to be completed by the person who did the connection or the work and is responsible for that work.

Choosing and using the right document

There are lots of certification forms and formats available, so choose a document based on the:

  • frequency of PEW undertaken
  • type and complexity of work most commonly undertaken e.g., domestic, commercial wiring, maintenance
  • business efficiency and ease of document management
  • professionalism you wish to portray of your business
  • ease of document storage for the required 7 years.

Certification documents

Make sure the certification documents are completed fully and correctly

Description of work 

When completing ESC, CoC or RoI, you need to include details of the work undertaken – be sure to record all the work that you were responsible for, the range of dates the work was carried out, and any supervised people involved with the work.

Feel free to attach any additional pages, information, drawings and documents to a CoC or RoI to provide the necessary detail.

Testing

It’s best trade practice to record all your test results. This provides additional proof and further verification of electrical safety.

What type of work

Take care to indicate what level of risk the work is and the standard it conforms with, don’t just tick all the boxes.

Supplier Declaration of Conformity (SDoC) and manufacturers instructions

If you are relying on manufacturers’ instructions and a supplier declaration of conformity (SDoC) only tick those boxes if you supply a copy or an internet link to those items. If you don’t supply a copy or link, then don’t tick those boxes.

Note for example 

You may have done the work according to the manufacturer’s instructions and the fittings you used comply with NZ standards have an SDoC. Let’s say these fittings were from long established reliable suppliers/manufacturers with reputable brands and products. However, if you do not provide a copy or link to the SDoC or manufacturer’s instructions with the CoC then you are not specifically relying on those documents and you do not tick those boxes. You can however always ask your supplier and they should be able to provide you with a copy or link to these documents.

If you have any doubt about the quality, safety or compliance with NZ standards of any electrical fitting, then ask to for a copy of the SDoC and manufacturers’ instructions and attach these to the CoC. This will give you protection against possible future liability associated with those fittings.

Leaving out information on a certification form

A CoC is an important legal document that confirms who was responsible for the work, that the work has been done lawfully, has been tested and all the information in the certificate is correct.

It is your responsibility to ensure this information is complete and correct otherwise the certification could be viewed as false or misleading.

Issuing certification - time frames

On completion of the Installation or electrical work that forms a part of that installation, the certification must be issued as soon as possible, within 20 days.

Electrical inspectors need to lodge the record of inspection details onto the Energy Safety high-risk data base within 20 working days.

Who should receive the certification documentation?

Certification documents must be handed, forwarded or otherwise made available to the person or company representative who contracted or authorised the electrical work to be undertaken.

Record keeping

Certification documents must be retained by the person who is considered the responsible person for these documents for a period of 7 years either in hard copy or electronically. 

The regulations set out the people and authorities who can legally ask for these documents at any time with in the 7-year period and the responsible person must be able to provide them within 10 working days.